Semester 2

 

March 31-April 4

Due Date Assignment
Tuesday, March 31

Email Check-in #2

 

Send an email to me with the subject: Check #2. For this email, you will describe the topics being covered in your TJHS classes. This needs to be in a bulleted list and each class must be its own bullet. You should include a topic sentence, after your greeting and before your bulleted list. A conclusion sentence should be included to wrap up your email, after the bulleted list and before your closing. You must still include a greeting, closing, and your name. (See the example below.) Text font and color must be a legible color, so we can read and see. Choose wisely (no yellow, no highlights, etc.).

Bonus: Insert/attach a photo. Click Mark as Done in Google Classroom when the assignment is completed

 

 

Friday, April 4

 

Technology and Engineering: Invention Presentation

First, click on this assignment to see ALL the parts in google classroom.
Second, watch the video.
Third, click on the Rubric to see the assignment directions and how you're going to be graded.
Fourth, click the Invention List to see the invention options with the links to start finding information.
Fifth, on the top right, click on YOUR COPY of the Invention Presentation. This is where you are to complete your work.

Last, when you are finished, click Turn in!

You should not be creating a blank slide presentation. There is a copy made for you with the directions in it.

 

 

 


March 23-27

Ms. Grear will be live on Google Meet from 8-9am Monday-Friday for anyone who needs help. Use code grearengineer to join our session at 8am. 

Due Date Assignment

Tuesday, March 24

 

E-Mail Check-in #1

Send an email to me with the subject: Check #1.
Using complete sentences, include 3 things you've done between March 16-20 that you wouldn't have done if we had school.
Include a greeting and a closing with your name.
Bonus: Change the text color to your favorite color.

 

Link to Assignment and Rubric

Video of how to complete assignment

 

Friday, 
March 27

Technology Engineering Hardware Presentation

 

Helpful video on adding Word Art

 

 

 


March 16-20

Day of the Week

Assignment

All Week None, get ready for March 23-April 3. You will be given your assignments on Google Classroom at that point. 
Feel free to work on Tinkercad or Code.org this week. 
You can still design things on TInkercad and send to Polar Cloud. Check your e-mail for my comments if you do send something. If you need help with anything, send an e-mail. 

 


March 9-13

Day of the Week

Assignment

Monday
3/9

Bridge Construction Day #6 Goals: 
Reinforce bridge and make it look good
Have your presentation close to done (only need finished bridge picture and mass of bridge)

Tuesday
3/10

Presentation finish Day

 

Wednesday  
3/11         

Bridge Presentations
(Even Teams for Periods 3, & 7,
Period 6 Teams 61 & 64)

Thursday
3/12

Bridge Presentations
(Odd Teams for Periods 3, & 7, 
Period 6 Teams 62, 63  & 65)

 

Friday
3/13

To Be Determined

March 2-6

Day of the Week

Assignment

Monday

Bridge Construction Day 1 Goals

1. Tape Drawing to Cardboard and Cover in Plastic Wrap
2. Work on Vehicle: Review the hints on the Bridge Project Page
3. Build I-Beams if being used in your bridge
4. Start Building Bottoms and Sides

Tuesday

Bridge Construction Day #2 Goals 
Work on Vehicle, you should only spend 2 days working on vehicle
Continue working on Sides and Bottom

Wednesday

Bridge Construction Day #3 Goals
Finish Vehicle and have it sent to the printers by the end of class
Sides and Bottoms of the brides need to be finished today
Begin working on Presentation while waiting for glue to dry

Thursday

Bridge Construction Day #4 Goals 
Attach a side to the bottom of the bridge
Work on Presentation while waiting for glue to dry

Friday

Bridge Construction Day #5 Goals 

Have your Bridge in one piece

Work on Presentation while waiting for glue to dry


February 24-28

Day of the Week Assignments
Monday
2/24

Bridge Side Drawing

 

Tuesday
2/25

1. Finish Bridge Side Drawing 

2. Bridge Project Page: Copy Vehicle and Presentation Requirements on to your Bridge Project Page in your journal

3. Ohio Historic Bridge Tour Look through the designs for inspiration

4. Design a Bridge in Tinkercad 

Wednesday
2/26

Bridge Project: 
1. Assign Team Jobs
2. Select Bridge Side Drawigng to become Blueprint
3, Complete Bridge Project Planning Sheet

Thursday Snow Day
Friday
Bridge Project: 
1. Individual Jobs meet with Ms. Grear
2. Tape blueprints copies together
3. Complete individual portion of individual jobs paper

February 18-21

Day of the Week

Assignments

Tuesday
2/18

1.Bridge Design Presentation Notes

2. Review on Quizlet

3. Bridge Games or Code.org

Cargo Bridge

Cargo Bridge 2

Wednesday
2/19

Create Beams for Strength Testing

Beams Investigation

Thursday
2/20

Beam Strength Testing

Beams Investigation

Friday (Kona Day)
2/21

1. Finish Beams Investigation
2. Beams Quiz on Google Classroom

3. Bridge Games

Cargo Bridge

Cargo Bridge 2

Bridge Builder:Make sure you read the directions UNDER the game window to understand how to operate the game. 


February 10-14

 

Day of the Week Assignments
Monday
2/10

1. Forces on Structures Notes

2.   Vocabulary Added to journal: 
       a. force- strength or power exerted upon an object
       b. compression- a force that pushed on or squeezes a material
       c. tension- stress that occurs when forces act to stretch an object
       d. torsion- the act of twisting

3. Finish Line Drawings

Tuesday
2/11

1. Forces on Structures Web Activity
     Building Big Website

2. Finish Line Drawings & turn in by end of class Today

3. Forces Review Quizlet

4. Bridge Games
Cargo Bridge

Cargo Bridge 2

Wednesday
2/12

1. Forces on Structures Quiz on Google Classroom
      Use your journal. Write your score at the top of the page where you glued in your notes. 

2. Beams Notes

3. Bridge Games

4. Bridge Games
Cargo Bridge

Cargo Bridge 2

Thursday
2/13

SNOW DAY

Friday
2/14

No School for Students

February 3-7

Day of the Week Assignments
Monday

Finish Keychains

 

Tuesday

Send Keychains to Printers on Polar Cloud

KeyChain Checklist: Go through this BEFORE sending the keychain to the printer

  1. Is it your name?

  2. Are all of the letters attached to each other?

  3. Where the letters are attached, is it enough that they will be strong after printing?

  4. Do you have a spot for the keyring to go through and is it attached to the rest of the keychain?

  5. Is the section for the keyring the correct size and shape? 

  6. Is everything flat and aligned to the bottom? (the bottom dot of the z-axis)

  7. Is the entire keychain the only thing in the file and one group?

  8. Is the entire keychain between 4.00mm and 10.00mm thick? (z-axis)

  9. Is the entire keychain less than 80.00mm in length? (x-axis)

  10. Is the entire keychain less than 25.00mm in width? (y-axis)

 

 

 

 

Wednesday

All Keychains have to be sent to Printers by end of class today

Name Brick Directions

 

Free Design on Tinkercad: Remember to Click Create New Design
Not everything in Tinkercad is meant to be 3D printed!

 

3D Printing Review

 Tinkercad Quiz

Thursday

How far will it go if we have enough bottle caps

Friday Robot Friday if all keychains are turned in

January 27-31

Day of the Week Assignments
Monday

1. Types of Engineers Crossword Puzzle
Use the Types of Engineers site to find the answers. This is due TODAY. You must turn it in, even if it's not finished.
It WILL NOT be accepted late. 

2. Question on Google Classroom
Make sure you answer both questions in complete sentences

3. Code.org
Lessons 4 & 5 are due at the end of this week. You will NOT have much time to work on them Wednesday-Friday

4. 3D Printing Review on Quizlet
Use this to review terms we've covered or will cover over 3D printing

5. Daily Log
Don't forget to skip a line after your last entry and write today's date (1/27) and a sentance about what you did in class today. 

 

Tuesday 3D Printing Setting Notes
Code.org
Wednesday Tinkercad Introduction and Starters
3D Printing Review
Thursday

Start Keychain Project

3D Printing Quiz

Code.org

 

Friday

Keychain Project


Code.org Lessons 4 & 5 are to be finished TODAY


January 21-24

Day of the Week Assignment
Tuesday

What is 3D Printing Notes

Work on Code.org

Wednesday

3D Printers Notes

Work on Code.org

Thursday

3D Printer Parts Notes

Work on Code.org

Friday

Work on Code.org
Lesson 2 & 3 have to be completed on Code.org

3D Printing Review


January 13-17

Day of the Week Assignments  

Monday

Expectations

Name Cards

Syllabus

Start Numbering Pages in Journal

 

Tuesday

Add Course on Google Classroom

Take Survey on Google Classroom

Finish Numbering Pages in Journal

Code.org Hour of Code tutorials

 

Wednesday

Pre-Test on Google Classroom

Journal Cover

Video for Covering Journal

Code.org Hour of Code tutorials

 

 

Thursday

Set Up Journal

Join Class on Code.org
Lesson 1 Helpful Hints

 

 

 

Friday

Code.org