About Me

Prior to startup, contaminants built into the system must be removed during China stainless steel fittings factory and assembly to ensure that the system has proper and predictable performance throughout its useful life. New or rebuilt hydraulic systems should be flushed before operation.

Typical instructions state that flushing must be performed at a normal system fluid speed for a certain period of time and a certain degree of filtration. More China SAE 37° Flare may require specific levels of fluid contamination and need to be documented through fluid contamination analysis. Flushing instructions typically specify the level of system cleanliness that must be achieved, and sometimes the fluid speed that must be maintained during the flushing process. The concept of flushing is to loosen and remove contaminant particles inside the system by forcing the China Flat Face Seal manufacturers through at high speed.